top of page
Welcome to our website
Periodic Inspection according to Adequacy NR-35
ANNEX II
3. Anchoring system requirements
3.1 Anchoring systems must:
a) be installed by trained workers;
b) be subjected to initial and periodic inspection.
3.1.1 The initial inspection must be carried out after installation, alteration or relocation.
3.1.2 The periodic inspection of the anchoring system must be carried out in accordance with the operating procedure, considering the anchoring system design and the assembly, respecting the manufacturer's instructions and the applicable regulatory and technical standards, with a frequency not exceeding
12 months.
MORE INFORMATION AND BUDGET:
(79) 3024-4985 - (79) 99922-7899
bottom of page